1.
Double Sidewall Combined Step Method for Ovoid Structured Tunnels with Additional Large Legs at the Lower Steps Research on Construction Technology. IJSHRE [Internet]. 3 Januari 2025 [dikutip 21 Oktober 2026];12(12). Tersedia pada: https://ijournals.in/journal/index.php/ijshre/article/view/317